An architecture and urban design studio working across cultural, civic and residential typologies — 47 completed projects across three continents, each one starting from a survey of the site, not a formal idea.
Before any design work begins, we spend two to four weeks on site — surveying topography, sun paths, prevailing wind, existing vegetation, soil conditions and the informal ways people already move through the land. This becomes a working document the whole team references for the life of the project, not a formality before the "real" design starts.
We test three to five distinct massing strategies against the site reading, usually as rough physical models before anything is modeled digitally. The goal at this stage isn't a final form — it's finding which massing logic responds honestly to the constraints we found on site.
Material selection happens early and drives structural logic, not the other way around. We work closely with structural and MEP engineers from schematic design onward so the building's systems are integrated into the architecture rather than retrofitted into it.
For civic and larger residential work, we run structured review sessions with stakeholders at each major milestone. Feedback is logged against the original site reading document, so we can trace every major decision back to a specific constraint or opportunity.
Our construction documentation is produced in-house through to permit set, with a dedicated technical team that stays engaged through the entire construction administration phase rather than handing off after permitting.
We return to every project twelve months after occupancy to measure how the building is actually being used against how it was designed to be used, and publish the findings internally to inform the next project's site reading.
A converted rail spur reopened as the city’s central library, built around a nine-foot grade change the site itself dictated.
A former ironworks converted into a multi-disciplinary arts venue, anchored by a switchback concrete stair that doubles as informal seating for 200.
Thirty-four units of infill terrace housing organized around three shared courtyards, replacing a single-story surface parking lot.
A 212-acre masterplan for a former industrial basin, phased over twelve years around existing drainage patterns rather than a conventional street grid.
A regional bus and light-rail interchange organized around a single covered concourse, replacing five disconnected boarding areas.
412 Foundry Street, Suite 300, San Francisco, CA 94107
18 architects, urban designers & landscape staff
Rua das Janelas Verdes 24, 1200-691 Lisboa, Portugal
6 architects, opened 2019
1100 East 6th Street, Austin, TX 78702
3 project architects, residential focus